Server chassis stacked in a rack under blue light, with cabling running alongside

Data Centers

Over 14 years focused on data center work

Over 14 years focused on data center work

Trusted by leading companies worldwide

Trusted by leading companies worldwide

Where we work

We didn't add data centers to a service list. We built the company around them.

Working only in data centers means we know how these buildings run, where they fail, and what uptime is worth. That experience goes into your project from the first drawing.

0M+

SQ FT white space under management

0M+

SQ FT white space under management

0M+

SQ FT white space under management

0GW+

Mission critical loadunder management

0GW+

Mission critical loadunder management

0GW+

Mission critical loadunder management

0+

Projects delivered nationwide

0+

Projects delivered nationwide

0+

Projects delivered nationwide

0%

On-time project delivery

0%

On-time project delivery

0%

On-time project delivery

What you're up against

Five things that go wrong in a data center long before anyone notices.

None of these are hypothetical. We have had these five conversations on nearly every project since 2012.

Challenges

Thermal envelope

Electrical blind spots

Fragmented visibility

Grid exposure

Commissioning risk

“The rack is hotter than the plant was designed for.”

AI density arrived faster than anyone's cooling plan. Liquid-cooled racks and CDUs now run on plants staged against a load profile that no longer exists. Cooling used to be a utility. Now it's the constraint.

Monitoring screens mounted in a rack showing system telemetry
Electrical distribution panels with status indicator lights
Cold aisle between server cabinets lit by blue ceiling strips
Fibre patch cables running into a network switch under blue light
Rear of a server rack row with power connections and cabling
Challenges

01

02

03

04

05

“The rack is hotter than the plant was designed for.”

AI density arrived faster than anyone's cooling plan. Liquid-cooled racks and CDUs now run on plants staged against a load profile that no longer exists. Cooling used to be a utility. Now it's the constraint.

Monitoring screens mounted in a rack showing system telemetry
Electrical distribution panels with status indicator lights
Cold aisle between server cabinets lit by blue ceiling strips
Fibre patch cables running into a network switch under blue light
Rear of a server rack row with power connections and cabling
Challenges

Thermal envelope

Electrical blind spots

Fragmented visibility

Grid exposure

Commissioning risk

“The rack is hotter than the plant was designed for.”

AI density arrived faster than anyone's cooling plan. Liquid-cooled racks and CDUs now run on plants staged against a load profile that no longer exists. Cooling used to be a utility. Now it's the constraint.

Monitoring screens mounted in a rack showing system telemetry
Electrical distribution panels with status indicator lights
Cold aisle between server cabinets lit by blue ceiling strips
Fibre patch cables running into a network switch under blue light
Rear of a server rack row with power connections and cabling

Divcon™ is the control layer that makes a building full of equipment behave like one machine.

Every problem above is a control problem. The chiller works and the switchgear works, but neither knows the other exists. Divcon builds the layer that connects them, sequencing the mechanical side, monitoring the electrical side, and putting both on one screen for the operator and the tenant.

THE DIVCON DIFFERENCE

Why it holds

Independent by structure

We have no parent manufacturer and no product line of our own, so there is nothing we need to sell you twice. What we specify is what the room needs, on open protocols and whatever the job actually calls for.

One firm, the whole chain

Controls engineering, UL-listed panel fabrication, installation, and 24/7 service after go-live, all in house. The people who drew it are the people who prove it at IST, and the people who answer the phone at two in the morning.

Built for any scale

A single facility or the largest campus in the portfolio. Three gigawatts of mission critical load and nine million square feet of white space, coast to coast, delivered by a team small enough that you know who to call.

And it holds up on the worst day

One thousand projects. Fourteen years. Not one missed the integrated systems test.

THE DIVCON DIFFERENCE

Why it holds

Independent by structure

We have no parent manufacturer and no product line of our own, so there is nothing we need to sell you twice. What we specify is what the room needs, on open protocols and whatever the job actually calls for.

One firm, the whole chain

Controls engineering, UL-listed panel fabrication, installation, and 24/7 service after go-live, all in house. The people who drew it are the people who prove it at IST, and the people who answer the phone at two in the morning.

Built for any scale

A single facility or the largest campus in the portfolio. Three gigawatts of mission critical load and nine million square feet of white space, coast to coast, delivered by a team small enough that you know who to call.

And it holds up on the worst day

One thousand projects. Fourteen years. Not one missed the integrated systems test.

THE DIVCON DIFFERENCE

Why it holds

Independent by structure

We have no parent manufacturer and no product line of our own, so there is nothing we need to sell you twice. What we specify is what the room needs, on open protocols and whatever the job actually calls for.

One firm, the whole chain

Controls engineering, UL-listed panel fabrication, installation, and 24/7 service after go-live, all in house. The people who drew it are the people who prove it at IST, and the people who answer the phone at two in the morning.

Built for any scale

A single facility or the largest campus in the portfolio. Three gigawatts of mission critical load and nine million square feet of white space, coast to coast, delivered by a team small enough that you know who to call.

And it holds up on the worst day

One thousand projects. Fourteen years. Not one missed the integrated systems test.

Dark data hall with rows of server cabinets reflected in a polished floor

Our Architecture

One contract across the whole build

Design, build, commissioning, and service run under one contract, with one team answering for all four.

Design

Controls engineering, pre-design assist, SCADA and interface design, submittals and shop drawings.

Build

DDC and PLC controls, instrumentation and valves, UL-listed panel fabrication, programming and installation.

Commission

Integrated systems testing. The whole build proves out here, and this is the part we have never missed.

Operate

24/7/365 support, remote alarming and monitoring, predictive failure analysis, and a fully staffed service department.

Dark data hall with rows of server cabinets reflected in a polished floor

Our Architecture

One contract across the whole build

Design, build, commissioning, and service run under one contract, with one team answering for all four.

Design

Controls engineering, pre-design assist, SCADA and interface design, submittals and shop drawings.

Build

DDC and PLC controls, instrumentation and valves, UL-listed panel fabrication, programming and installation.

Commission

Integrated systems testing. The whole build proves out here, and this is the part we have never missed.

Operate

24/7/365 support, remote alarming and monitoring, predictive failure analysis, and a fully staffed service department.

START A CONVERSATION

Advanced Solutions, Absolute Resilience

Tell us about your next project and a Divcon specialist will be in touch.

START A CONVERSATION

Advanced Solutions, Absolute Resilience

Tell us about your next project and a Divcon specialist will be in touch.

START A CONVERSATION

Advanced Solutions, Absolute Resilience

Tell us about your next project and a Divcon specialist will be in touch.